Tax included, Shipping not included
Central control unit has found out that the residential area in zone 2 no onger develops in concordance with “city” expansion. Breach of initial protocol suspected. Control system for energy distribution signals a slowdown in activity. Planning for urban integration is no longer working between the original core and external super-structures.
Tracklisting:
A1- The Lost Laboratory
A2- The Global City Vision
B1-Entropic Landscape
Tracklist
Track 1
Track 2
Track 3